With the legitimation of this RUPTL, the construction of a Steam Gas Power Plant (SGPP) with a capacity of 2×800 Mega Watt will be available for industrial needs in the Special Economic Zone (SEZ) of Sei Mangkei.
With the legitimation of this RUPTL, the construction of a Steam Gas Power Plant (SGPP) with a capacity of 2×800 Mega Watt will be available for industrial needs in the Special Economic Zone (SEZ) of Sei Mangkei.