Practical answers to the questions investors ask most often about Sei Mangkei SEZ, the special economic zone in North Sumatra managed by PT Kawasan Industri Nusantara (PT KINRA): land, prices, incentives, permits, utilities, logistics, workforce, and visits.

About the zone

What is Sei Mangkei SEZ?

Sei Mangkei Special Economic Zone (KEK Sei Mangkei) is a special economic zone in Bosar Maligas, Simalungun Regency, North Sumatra. It was designated by Government Regulation No. 29 of 2012 and was the first SEZ to operate in Indonesia, inaugurated by the President on 27 January 2015. Its main activities are palm oil and rubber processing, logistics, and tourism.

Who develops and manages Sei Mangkei SEZ?

PT Perkebunan Nusantara III was designated as the development and management agency of the zone by the Regent of Simalungun. Its subsidiary, PT Kawasan Industri Nusantara (PT KINRA), runs the development, management, and marketing of Sei Mangkei SEZ. Licensing is handled by the SEZ Administrator. See the legal basis.

How large is the zone and how much land is still available?

The zone covers 1,933.8 ha. In November 2024 PT KINRA reported that about 450 ha (±25%) was occupied, with a target of 860 ha within five years. Land for palm oil industries is largely taken up, so new allocations focus on rubber downstream and other industries. Check the siteplan and ask our team for available plots.

Which industries can invest in Sei Mangkei SEZ?

The zone focuses on palm oil and rubber downstream industries, oleochemicals, and other agro-based industries, with a various industrial zone for textiles, electronics, chemicals, food, and building materials, plus logistic and tourism zones. About 60% of current businesses are in the oleochemical and refinery sectors.

Land, prices, and permits

How much is the industrial land lease price?

Lease prices depend on location, plot size, and lease terms, and are updated periodically. We do not publish a price list; see how land lease prices are set. Contact the marketing team at marketing@seimangkeisez.co.id for the latest price and a written land offer.

What plot sizes are available?

Plot availability changes as tenants move in, so plot options are prepared for each project. Tell us how much land and which utilities you need, and our marketing team will propose suitable plots from the siteplan.

What tax incentives are available?

Main activities can receive a tax holiday of up to 100% corporate income tax reduction for investments of at least Rp100 billion: 10 years (Rp100 billion to under Rp500 billion), 15 years (Rp500 billion to under Rp1 trillion), and 20 years (Rp1 trillion or more). Other activities can receive a tax allowance. VAT and luxury goods sales tax are not levied on qualifying transactions. See the incentives page.

How do business permits work in the SEZ?

The SEZ Administrator provides a one-stop service for business licenses as well as immigration, labor, and land permits, with accelerated issuance once requirements are complete. Business licensing is integrated with Indonesia’s national OSS system.

Can foreign investors and foreign staff work and live in the zone?

Yes. The zone is open to foreign investors. Non-fiscal incentives include visa on arrival for 30 days (extendable), one-year multiple-entry visas, facilitation of foreign worker permits, and residential property ownership for foreigners in the SEZ with a residence permit.

Utilities and logistics

What utilities are available for tenants?

A 60 MVA PLN main substation, a 75 MMSCFD natural gas pipeline supplied from Arun, a water treatment plant using raw water from the Bah Tongguran River, a 250 m³/hour wastewater treatment plant running 24 hours, and a fiber-optic network of up to 100 Mbps. See infrastructure.

Is renewable energy available?

Yes. A 2.4 MW biogas power plant uses palm oil mill effluent, a 3.5 MW biomass power plant is under construction, and a 3 MW solar power plant is being developed by Pertamina NRE and PTPN III.

How far is Sei Mangkei SEZ from Kuala Tanjung Port?

About 40 km. The zone is also about 10 km from the Trans-Sumatra highway, about 130 km (around 1 hour 20 minutes by toll road) from Medan, and about 110 km from Kualanamu International Airport via the toll road. See location.

Is there a port or rail connection inside the zone?

Yes. The Sei Mangkei Dry Port, the only dry port in Sumatra, has a capacity of 2,300 TEUs and is linked by rail and road to Kuala Tanjung and Belawan ports. PT KINRA works with PT Kereta Api Indonesia (Persero) to move CPO and other cargo by train.

Can I lease storage tanks for CPO?

Yes. The tank farm is available for lease with a capacity of 25,000 tons of CPO and 6,000 tons of CPKO, made up of five 5,000-ton tanks and two 3,000-ton tanks.

Workforce and visits

Is a workforce available?

Sei Mangkei SEZ is projected to employ 83,304 people by 2031. The zone has workers’ flats (rusunawa) near the estate, and PT KINRA has signed a memorandum of understanding with the Indonesian Employers Association (APINDO). Labor incentives include a wage council and tripartite cooperation institution in the SEZ.

Can I tour the zone before investing?

Yes. Guided site visits are available for potential investors. Contact us to schedule a visit (office hours Monday–Friday, 08.00–17.00 WIB). You can also explore the zone online with the virtual tour.

How do I start investing?

Start with a consultation with our marketing team, followed by a site visit, a land offer, the land agreement, SEZ licensing, and construction. The full steps are on the investor guide.

Still have questions?

Our marketing team will help with land availability, current lease prices, and incentive eligibility for your project.